01
Define the room
Choose the discipline, use case, dimensions, ceiling height, rack location, and key design assumptions.
Low-voltage design software
LV-Architect turns room requirements and device placement into a coordinated low-voltage design package: floor plan, reflected ceiling plan, riser, BOM, cable schedule, and system narrative.
01
Choose the discipline, use case, dimensions, ceiling height, rack location, and key design assumptions.
02
Drop displays, speakers, cameras, mics, switches, racks, panels, and field devices into the layout.
03
Review the generated riser, BOM, cable schedule, narrative, and export package.
The canvas supports AV, conferencing, telecom, security, access control, fire alarm, paging, lighting coordination, and structured cabling in one model.
The output is meant to be reviewed, quoted, and coordinated. It does not replace a stamped engineer-of-record deliverable.
These answers are visible on the page and mirrored in structured data so crawlers see the same content users do.
No. It creates a coordinated low-voltage design package and export set. Final construction documents still need professional review and the normal project approval path.
Yes. The device catalog and rules cover AV, conferencing, security, access control, fire alarm device layout, paging, telecom, networking, and infrastructure.