Worked example
Shades & Rigging
120 ft × 80 ft performance hall: motorized window shades plus a stage-area truss grid on ground-support towers with electric chain hoists + motor controller, battens, line-set, and followspot positions. Rigging objects are coordination glyphs — load/span/safety-factor design stays with the qualified rigger (ANSI E1.x). (House lighting controls now live in the dedicated Lighting demo.)
- Rooms
- 1
- Placed devices
- 32
- BOM lines
- 27
- Cable runs
- 25
Rooms in this example
Performance Hall — Shades & Rigging
32 placed devices · 27 BOM lines · 25 cable runs
Other worked examples
AV / ConferencingAV — Teams Room (Soft PC)AV — BYOD Training RoomAV — AV-over-IP BoardroomAV — Presentation Switcher (all-in-one)AV — Huddle Room (4-person)AV — Video Matrix BoardroomAV — Soft Codec + Switcher (Divisible)AV — 70V BGM + Paging (Retail)AV — Multi-Room (Shared Head-End)AV — Auditorium / Line ArrayHealthcare — Telemedicine Exam RoomHealthcare — Clinic Wing (LV)Network / IT — Structured CablingFire & Life SafetyFire — Warehouse / High-BayFire — Hotel Floor (Voice Evac)CCTV & Access ControlCCTV — Retail StorefrontCCTV — Parking GarageLighting ControlsLighting — Hospitality LobbyResidential - Luxury EstateShades — Executive BoardroomRigging — Worship Center
Standards-aware output is a coordination aid. Final equipment selection, code compliance, AHJ approval, and stamped engineering stay with the qualified project team.