Worked example
Fire & Life Safety
30 ft × 40 ft office floor with FACP, manual pull stations at each egress, smoke + heat detector coverage, horn-strobe notification, and sprinkler-head locations as coordination glyphs (NFPA 13 hydraulic design out of scope).
- Rooms
- 1
- Placed devices
- 23
- BOM lines
- 9
- Cable runs
- 15
Rooms in this example
Office Floor — Fire Alarm + Suppression Coordination
23 placed devices · 9 BOM lines · 15 cable runs
Other worked examples
AV / ConferencingAV — Teams Room (Soft PC)AV — BYOD Training RoomAV — AV-over-IP BoardroomAV — Presentation Switcher (all-in-one)AV — Huddle Room (4-person)AV — Video Matrix BoardroomAV — Soft Codec + Switcher (Divisible)AV — 70V BGM + Paging (Retail)AV — Multi-Room (Shared Head-End)AV — Auditorium / Line ArrayHealthcare — Telemedicine Exam RoomHealthcare — Clinic Wing (LV)Network / IT — Structured CablingFire — Warehouse / High-BayFire — Hotel Floor (Voice Evac)CCTV & Access ControlCCTV — Retail StorefrontCCTV — Parking GarageLighting ControlsLighting — Hospitality LobbyResidential - Luxury EstateShades & RiggingShades — Executive BoardroomRigging — Worship Center
Standards-aware output is a coordination aid. Final equipment selection, code compliance, AHJ approval, and stamped engineering stay with the qualified project team.